V98 all plans
This area of the Long Mound was planned conventionally up to Plan 4, then off grid (i.e. grid rotated to match Long Mound axis). Plan 1 missing. Plans 2 & 3 hand very poor scans. Plan 4 hand only. For after plan 4, and also for overlay plans 3a, 3b and 3c, see V97. The SE corner triangle of this square was not dug in CH90/91, but was completed later - likely to have been planned with U99 (almost all plans missing). CH92 Feature Plan of part of square found in archive (added to main FP already).